Vol 25 No 7 (2019)

Published: 2019-07-02

Articles

Page 617-630

Page 654-672

An extended TODIM method for project manager’s competency evaluation

Jielin Yin, Jian Guo, Tianmeng Ji, Jingru Cai, Lei Xiao, Zhao Dong
Abstract 2390 | PDF Downloads 898 | DOI https://doi.org/10.3846/jcem.2019.10521

Page 673-686

A model for evaluating the risk effects on construction project activities

Usama Hamed Issa, Salah Attia Mosaad, Mohamed Salah Hassan
Abstract 1808 | PDF Downloads 1201 | DOI https://doi.org/10.3846/jcem.2019.10531

Page 687-699

Additional stress in soil embankments subjected to a new prestressed reinforcement device

Qishu Zhang, Wuming Leng, Fang Xu, Qi Yang, Xi Ai
Abstract 1057 | PDF Downloads 716 | DOI https://doi.org/10.3846/jcem.2019.10532

Page 700-714

Forecasting of sports fields construction costs aided by ensembles of neural networks

Michał Juszczyk, Krzysztof Zima, Wojciech Lelek
Abstract 1760 | PDF Downloads 1097 | DOI https://doi.org/10.3846/jcem.2019.10534

Page 715-729