Vol 16 No 1 (2010)
Published: 2010-03-31
Articles
The driving factors of china's public‐private partnership projects in Metropolitian transportation systems: Public sector's viewpoint
Abstract 934 | PDF Downloads 653 | DOI https://doi.org/10.3846/jcem.2010.01
Page 5-18
The public sector's perspective on procuring public works projects – comparing the views of practitioners in Hong Kong and Australia
Abstract 714 | PDF Downloads 543 | DOI https://doi.org/10.3846/jcem.2010.02
Page 19-32
Risk assessment of construction projects
Abstract 4527 | PDF Downloads 2610 | DOI https://doi.org/10.3846/jcem.2010.03
Page 33-46
Subcontractor selection practices in international construction projects
Abstract 855 | PDF Downloads 942 | DOI https://doi.org/10.3846/jcem.2010.04
Page 47-56
Construction contractor prequalification from polish clients’ perspective
Abstract 675 | PDF Downloads 412 | DOI https://doi.org/10.3846/jcem.2010.05
Page 57-64
Influence of quality performance on clients’ patronage of indigenous and expatriate construction contractors in Nigeria
Abstract 563 | PDF Downloads 355 | DOI https://doi.org/10.3846/jcem.2010.06
Page 65-73
Customer behavior and decision making in the refurbishment industry‐a data mining approach
Abstract 856 | PDF Downloads 548 | DOI https://doi.org/10.3846/jcem.2010.07
Page 75-84
Precast concrete systems in developing vs. industrialized countries
Abstract 1156 | PDF Downloads 817 | DOI https://doi.org/10.3846/jcem.2010.08
Page 85-94
Global optimization of grillages using simulated annealing and high performance computing
Abstract 546 | PDF Downloads 735 | DOI https://doi.org/10.3846/jcem.2010.09
Page 95-101
Saosys toolbox as Matlab implementation in the elastic‐plastic analysis and optimal design of steel frame structures
Abstract 508 | PDF Downloads 469 | DOI https://doi.org/10.3846/jcem.2010.10
Page 103-121
Evaluation of PFWD as potential quality control tool of pavement layers
Abstract 621 | PDF Downloads 358 | DOI https://doi.org/10.3846/jcem.2010.11
Page 123-129
Design of people evacuation from rooms and buildings
Abstract 670 | PDF Downloads 464 | DOI https://doi.org/10.3846/jcem.2010.12
Page 131-139
Required additional heating power of building during intermitted heating
Abstract 549 | PDF Downloads 399 | DOI https://doi.org/10.3846/jcem.2010.13
Page 141-148
Non‐linear analysis of suspension bridges with flexible and rigid cables
Abstract 673 | PDF Downloads 575 | DOI https://doi.org/10.3846/jcem.2010.14
Page 149-154