Collaborative project delivery methods: a scoping review
Abstract
Understanding how to systemise, organise, and finance the design, construction, operation, and maintenance activities are all parameters needed to be optimised simultaneously in a Project Delivery Method. To meet the challenges of increasingly complex projects, a new class of delivery methods is emerging. These methods are often labelled “collaborative” since they seek to align the client’s interest with those of the supply chain. The purpose of this article is to present the current state-of-the-art through a review of 156 identified articles concerning Partnering, Integrated Project Delivery, Alliancing, Relational Contracting, and Relationship-Based Procurement. A framework for the methodological procedure based on the state of the art within qualitative research was elaborated and is reported on in this paper. The results show that there is a range of research on collaborative project delivery methods across the world. By analysing the study purposes, important themes generated and delineated as a) Conceptualisation, b) Implementation and experiences, c) Pros & Cons, d) Building Partnership & Social Dimensions, and e) Performance and Success. The paper provides an overview of collaborative project delivery methods identified in the realm of academic journals. Secondly, knowledge gaps have been identified by creating a summary of the body of evidence.
Keyword : project delivery methods, collaboration, partnering, integrated project delivery (IPD), alliancing, relational contracting (RC), relationship based procurement (RBP), partnerships, contracting, procurement
This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Alderman, N., & Ivory, C. (2007). Partnering in major contracts: Paradox and metaphor. International Journal of Project Management, 25(4), 386–393. https://doi.org/10.1016/j.ijproman.2007.01.002
Alhazmi, T., & McCaffer, R. (2000). Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), 176–184. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:3(176)
Ali, A.-S., Mohd-Don, Z., Alias, A., Kamaruzzaman, S.-N., & Pitt, M. (2010). The performance of construction partnering projects in Malaysia. International Journal of Physical Sciences, 5(4), 327–333.
American Society of Civil Engineers. (1997). Project delivery systems. In Quality in the Constructed Project.
Anderson, L., & Polkinghorn, B. (2011). Efficacy of partnering on the Woodrow Wilson Bridge project: Empirical evidence of collaborative problem-solving benefits. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 3(1), 17–27. https://doi.org/10.1061/(asce)la.1943-4170.0000044
Anderson, S., & Oyetunji, A. (2003). Selection procedure for project delivery and contract strategy. In Construction Research Congress. Honolulu, Hawaii, United States. https://doi.org/10.1061/40671(2003)83
Anthony, E., Sparkling, S. M., & Ahmet, K. (2017). Research synthesis connecting trends in architecture, engineering, and construction project partnering. Journal of Management in Engineering, 33(1), 04016033. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000481
Arksey, H., & O’Malley, L. (2005). Scoping studies: Towards a methodological framework. International Journal of Social Research Methodology, 8(1), 19–32. https://doi.org/10.1080/1364557032000119616
Asmar, M. E., Awad S., H., & Wei-Yin, L. (2016). Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1), 04015046. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001015
Asmar, M. E., Hanna, A. S., & Loh, W.-Y. (2013). Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11), 04013012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000744
Austin, S., Newton, A., Steele, J., & Waskett, P. (2002). Modelling and managing project complexity. International Journal of Project Management, 20(3), 191–198. https://doi.org/10.1016/S0263-7863(01)00068-0
Baccarini, D. (1996). The concept of project complexity – a review. International Journal of Project Management, 14(4), 201–204. https://doi.org/10.1016/0263-7863(95)00093-3
Bayliss, R., Cheung, S.-O., Suen, H. C. H., & Wong, S.-P. (2004). Effective partnering tools in construction: A case study on MTRC TKE contract 604 in Hong Kong. International Journal of Project Management, 22(3), 253–263. https://doi.org/10.1016/S0263-7863(03)00069-3
Beach, R., Webster, M., & Campbell, K. M. (2005). An evaluation of partnership development in the construction industry. International Journal of Project Management, 23(8), 611–621. https://doi.org/10.1016/j.ijproman.2005.04.001
Bilbo, D., Bigelow, B., Escamilla, E., & Lockwood, C. (2015). Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1), 40–53. https://doi.org/10.1080/15578771.2013.872734
Black, C., Akintoye, A., & Fitzgerald, E. (2000). An analysis of success factors and benefits of partnering in construction. International Journal of Project Management, 18(6), 423–434. https://doi.org/10.1016/S0263-7863(99)00046-0
Bresnen, M. (2007). Deconstructing partnering in project-based organisation: Seven pillars, seven paradoxes and seven deadly sins. International Journal of Project Management, 25(4), 365–374. https://doi.org/10.1016/j.ijproman.2007.01.007
Bresnen, M., & Marshall, N. (2000a). Building partnerships: Case studies of clientcontractor collaboration in the UK construction industry. Construction Management and Economics, 18(7), 819–832. https://doi.org/10.1080/014461900433104
Bresnen, M., & Marshall, N. (2000b). Motivation, commitment and the use of incentives in partnerships and alliances. Construction Management and Economics, 18(5), 587–598. https://doi.org/10.1080/014461900407392
Bresnen, M., & Marshall, N. (2000c). Partnering in construction: a critical review of issues, problems and dilemmas. Construction Management & Economics, 18(2), 229–237. https://doi.org/10.1080/014461900370852
Bresnen, M., & Marshall, N. (2002). The engineering or evolution of co-operation? A tale of two partnering projects. International Journal of Project Management, 20(7), 497–505. https://doi.org/10.1016/S0263-7863(01)00043-6
Bygballe, L. E., Jahre, M., & Swärd, A. (2010). Partnering relationships in construction: A literature review. Journal of Purchasing and Supply Management, 16(4), 239–253. https://doi.org/10.1016/j.pursup.2010.08.002
Bygballe, L. E., Dewulf, G., & Levitt, R. E. (2015). The interplay between formal and informal contracting in integrated project delivery. Engineering Project Organization Journal, 5(1), 22–35. https://doi.org/10.1080/21573727.2014.992014
Børve, S., Rolstadås, A., Andersen, B., & Aarseth, W. (2017). Defining project partnering. International Journal of Managing Projects in Business, 10(4), 666–699. https://doi.org/10.1108/IJMPB-10-2016-0076
Cacamis, M. E., & Asmar, M. E. (2014). Improving project performance through partnering and emotional intelligence. Practice Periodical on Structural Design and Construction, 19(1), 50–56. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000180
Chan, A. P. C., Chan, D. W. M., & Ho, K. S. K. (2003a). An empirical study of the benefits of construction partnering in Hong Kong. Construction Management and Economics, 21(5), 523–533. https://doi.org/10.1080/0144619032000056162
Chan, A. P. C., Chan, D. W. M., & Ho, K. S. K. (2003b). Partnering in construction: Critical study of problems for implementation. Journal of Management in Engineering, 19(3), 126–135. https://doi.org/10.1061/(ASCE)0742-597X(2003)19:3(126)
Chan, A. P. C., Chan, D. W. M., Chiang, Y. H., Tang, B. S., Chan, E. H. W., & Ho, K. S. K. (2004). Exploring critical success factors for partnering in construction projects. Journal of Construction Engineering and Management, 130(2), 188–198. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(188)
Chan, A. P. C., Chan, D. W. M., Fan, L. C. N., Lam, P. T. I., & Yeung, J. F. Y. (2008). Achieving partnering success through an incentive agreement: Lessons learned from an underground railway extension project in Hong Kong. Journal of Management in Engineering, 24(3), 128–137. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:3(128)
Chan, A. P. C., Hu, Y., Ma, L., Shan, M., & Le, Y. (2016). Improving the outcomes of public drainage projects through NEC3based relational contracting: Hong Kong case study. Journal of Professional Issues in Engineering Education and Practice, 142(2), 06015003. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000262
Chan, A. P. C., Zhao, Z. Y., Xia, B., Zillante, G., & Zuo, J. (2013). Supporting and impeding factors for partnering in construction: A China study. Facilities, 31(11/12), 468–488. https://doi.org/10.1108/F-05-2012-0038
Che Ibrahim, C. K. I., Costello, S. B., & Wilkinson, S. (2013). Development of a conceptual team integration performance index for alliance projects. Construction Management and Economics, 31(11), 1128–1143. https://doi.org/10.1080/01446193.2013.854399
Che Ibrahim, C. K. I., Costello, S. B., & Wilkinson, S. (2014). Establishment of quantitative measures for team integration assessment in alliance projects. Journal of Management in Engineering, 31(5), 04014075. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000318
Che Ibrahim, C. K. I., Costello, S. B., & Wilkinson, S. (2015). Development of an assessment tool for team integration in alliance projects. International Journal of Managing Projects in Business, 8(4), 813–827. https://doi.org/10.1108/IJMPB-02-2015-0019
Che Ibrahim, C. K. I., Costello, S. B., Wilkinson, S., & Walker, D. H. T. (2017). Innovation in alliancing for improved delivery of road infrastructure projects. International Journal of Managing Projects in Business, 10(4), 700–720. https://doi.org/10.1108/IJMPB-11-2016-0088
Chen, G., Zhang, G. M., & Xie, M. (2012). Cost management in project alliancing: An exploratory investigation. Applied Mechanics and Materials, 174–177, 2893–2897. https://doi.org/10.4028/www.scientific.net/amm.174-177.2893
Chen, G., Zhang, G., & Xie, Y. M. (2015). Impact of transaction attributes on transaction costs in project alliances: Disaggregated analysis. Journal of Management in Engineering, 31(4), 04014054. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000259
Chen, T.-T., & Wu, T.-C. (2012). Construction project partnering using fuzzy based decision making methodology. Journal of the Chinese Institute of Engineers, 35(3), 269–284. https://doi.org/10.1080/02533839.2012.655462
Chen, W. T., & Chen, T.-T. (2007). Critical success factors for construction partnering in Taiwan. International Journal of Project Management, 25(5), 475–484. https://doi.org/10.1016/j.ijproman.2006.12.003
Chen, Y. Q., Liu, J. Y., Li, B., & Lin, B. (2011). Project delivery system selection of construction projects in China. Expert Systems with Applications, 38(5), 5456–5462. https://doi.org/10.1016/j.eswa.2010.10.008
Chen, Y. Q., Lu, H., Lu, W., & Zhang, N. (2010). Analysis of project delivery systems in Chinese construction industry with data envelopment analysis (DEA). Engineering, Construction and Architectural Management, 17(6), 598–614. https://doi.org/10.1108/09699981011090215
Cheng, E. W. L., & Li, H. (2004). Development of a practical model of partnering for construction projects. Journal of Construction Engineering and Management, 130(6), 790–798. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(790)
Cheng, E. W. L., Li, H., Drew, D. S., & Yeung, N. (2001). Infrastructure of partnering for construction projects. Journal of Management in Engineering, 17(4), 229–237. https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(229)
Cheng, E. W. L. (2016). Intentions to form project partnering in Hong Kong: Application of the theory of planned behavior. Journal of Construction Engineering and Management, 142(12), 04016075. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001200
Cheung, S. O., Ng, T. S. T., Wong, S.-P., & Suen, H. C. H. (2003). Behavioral aspects in construction partnering. International Journal of Project Management, 21(5), 333–343. https://doi.org/10.1016/S0263-7863(02)00052-2
Cheung, S. O., Yiu, K. T., & Chim, P. S. (2006). How relational are construction contracts? Journal of Professional Issues in Engineering Education and Practice, 132(1), 48–56. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:1(48)
Colquhoun, H. L., Levac, D., O’Brien, K. K., Straus, S., Tricco, A. C., Perrier, L., Kastner, M., & Moher, D. (2014). Scoping reviews: time for clarity in definition, methods, and reporting. Journal of Clinical Epidemiology, 67(12), 1291–1294. https://doi.org/10.1016/j.jclinepi.2014.03.013
Conley, M. A., & Gregory, R. A. (1999). Partnering on small construction projects. Journal of Construction Engineering and Management, 125(5), 320–324. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:4(346)
Construction Industry Institute. (2003). IR165-2 – Owner’s tool for project delivery and contract strategy selection user’s guide (2nd ed.). https://www.construction-institute.org
Crespin-Mazet, F., & Portier, P. (2010). The reluctance of construction purchasers towards project partnering. Journal of Purchasing and Supply Management, 16(4), 230–238. https://doi.org/10.1016/j.pursup.2010.06.001
Cullen, P.-A. F., & Hickman, R. J. (2012). Conflicts between contract law and relational contracting. Lean Construction Journal, 49–60.
Daudt, H. M. L., van Mossel, C., & Scott, S. J. (2013). Enhancing the scoping study methodology: A large, inter-professional team’s experience with Arksey and O’Malley’s framework. BMC Medical Research Methodology, 13(1), 48. https://doi.org/10.1186/1471-2288-13-48
Davis, P., & Love, P. (2011). Alliance contracting: Adding value through relationship development. Engineering, Construction and Architectural Management, 18(5), 444–461. https://doi.org/10.1108/09699981111165167
Davis, R., Campbell, R., Hildon, Z., Hobbs, L., & Michie, S. (2015). Theories of behaviour and behaviour change across the social and behavioural sciences: A scoping review. Health Psychology Review, 9(3), 323–344. https://doi.org/10.1080/17437199.2014.941722
Dewulf, G., & Kadefors, A. (2012). Collaboration in public construction – contractual incentives, partnering schemes and trust. Engineering Project Organization Journal, 2(4), 240–250. https://doi.org/10.1080/21573727.2012.684876
Doloi, H. (2012). Empirical analysis of traditional contracting and relationship agreements for procuring partners in construction projects. Journal of Management in Engineering, 29(3), 224–235. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000141
Drexler, J. A., & Larson, E. W. (2000). Partnering: Why project owner-contractor relationships change. Journal of Construction Engineering and Management, 126(4), 293–297. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:4(293)
Du, L., Tang, W., Liu, C., Wang, S., Wang, T., Shen, W., Huang, M., & Zhou, Y. (2016). Enhancing engineer–procure–construct project performance by partnering in international markets: Perspective from Chinese construction companies. International Journal of Project Management, 34(1), 30–43. https://doi.org/10.1016/j.ijproman.2015.09.003
El-adaway, I. H. (2010). Integrated project delivery case study: Guidelines for drafting partnering contract. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2(4), 248–254. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000024
El-adaway, I. H. (2012). Promoting the sustainability of relational contracting through addressing third party insurance obstacles. Journal of Management in Engineering, 29(3), 216–223. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000140
El-adaway, I. H., Abotaleb, I., & Eteifa, S. (2017). Framework for multiparty relational contracting. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(3), 04517018. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000238
Engebø, A., Iversen, M. H., Houck, L. D., Lædre, O., & Lohne, J. (2018). Reputation management in the AEC-industry after work-related crime. Periodica Polytechnica Architecture, 49(2), 176–184. https://doi.org/10.3311/PPar.12696
Engebø, A., Lædre, O., Danielsen, D. A., & Lohne, J. (2017). Norwegian contractors’ professional ethics and outward ethical credibility – the case of ethical framework. Paper presented at The 9th Nordic Conference on Construction Economics and Organization. Chalmers University of Technology, Göteborg, Sweden.
Engebø, A., Skatvedt, Å., & Torp, O. (2019). Soft elements in collaborative project delivery methods. In 27th Annual Conference of the International Group for Lean Construction (IGLC). Dublin, Ireland. https://doi.org/10.24928/2019/0192
Eriksson, P. E. (2010). Partnering: what is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), 905–917. https://doi.org/10.1080/01446190903536422
Eriksson, P. E. (2015). Partnering in engineering projects: Four dimensions of supply chain integration. Journal of Purchasing and Supply Management, 21(1), 38–50. https://doi.org/10.1016/j.pursup.2014.08.003
Eriksson, P. E., & Nilsson, T. (2008). Partnering the construction of a Swedish pharmaceutical plant: Case study. Journal of Management in Engineering, 24(4), 227–233. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:4(227)
Eriksson, P. E., & Pesämaa, O. (2013). Buyer‐supplier integration in project‐based industries. Journal of Business & Industrial Marketing, 28(1), 29–40. https://doi.org/10.1108/08858621311285697
Esther Paik, J., Miller, V., Mollaoglu, S., & Aaron Sun, W. (2017). Interorganizational projects: Reexamining innovation implementation via IPD cases. Journal of Management in Engineering, 33(5), 04017017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000524
Ey, W., Zuo, J., & Han, S. (2014). Barriers and challenges of collaborative procurements: An exploratory study. International Journal of Construction Management, 14(3), 148–155. https://doi.org/10.1080/15623599.2014.922725
Fernandes, D. A., Costa, A. A., & Lahdenperä, P. (2017). Key features of a project alliance and their impact on the success of an apartment renovation: A case study. International Journal of Construction Management, 18(6), 482–496. https://doi.org/10.1080/15623599.2017.1344913
Fischer, M., Khanzode, A., Reed, D., & Ashcraft, H. W. (2017). Integrating project delivery. John Wiley & Sons. https://doi.org/10.1002/9781119049272
Forbes, L. H., & Ahmed, S. M. (2010). Modern construction: Lean project delivery and integrated practices. CRC press. https://doi.org/10.1201/b10260
Ghassemi, R., & Becerik-Gerber, B. (2011). Transitioning to integrated project delivery: Potential barriers and lessons learned. Lean Construction Journal, 32–52.
Gil, R., & Marion, J. (2012). Self-enforcing agreements and relational contracting: Evidence from California highway procurement. The Journal of Law, Economics, & Organization, 29(2), 239–277. https://doi.org/10.1093/jleo/ewr026
Gordon, C. M. (1994). Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), 196–210. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(196)
Gottlieb, S. C., & Jensen, J. S. (2012). Making sense of partnering: Discourses, governance and institutional change. Engineering Project Organization Journal, 2(3), 159–170. https://doi.org/10.1080/21573727.2012.695732
Gransberg, D. D., Dillon, W. D., Reynolds, L., & Boyd, J. (1999). Quantitative analysis of partnered project performance. Journal of Construction Engineering and Management, 125(3), 161–166. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(161)
Griffiths, P., Renz, A., Hughes, J., & Rafferty, A. M. (2009). Impact of organisation and management factors on infection control in hospitals: A scoping review. Journal of Hospital Infection, 73(1), 1–14. https://doi.org/10.1016/j.jhin.2009.05.003
Hanna, A. S. (2016). Benchmark performance metrics for integrated project delivery. Journal of Construction Engineering and Management, 142(9), 04016040. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001151
Harper, C. M., Molenaar, K. R., & Cannon, J. P. (2016). Measuring constructs of relational contracting in construction projects: The owner’s perspective. Journal of Construction Engineering and Management, 142(10), 04016053. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001169
Hartmann, A., & Bresnen, M. (2011). The emergence of partnering in construction practice: An activity theory perspective. Engineering Project Organization Journal, 1(1), 41–52. https://doi.org/10.1080/21573727.2010.549609
Hauck, A. J., Walker, D. H. T., Hampson, K. D., & Peters, R. J. (2004). Project alliancing at National Museum of Australia – Collaborative process. Journal of Construction Engineering and Management, 130(1), 143–152. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(143)
Heidemann, A., & Gehbauer, F. (2011). The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(1), 19–30. https://doi.org/10.1108/13664381111116052
Hietajärvi, A.-M., Aaltonen, K., & Haapasalo, H. (2017a). Managing integration in infrastructure alliance projects: Dynamics of integration mechanisms. International Journal of Managing Projects in Business, 10(1), 5–31. https://doi.org/10.1108/ijmpb-02-2016-0009
Hietajärvi, A.-M., Aaltonen, K., & Haapasalo, H. (2017b). Opportunity management in large projects: A case study of an infrastructure alliance project. Construction Innovation, 17(3), 340–362. https://doi.org/10.1108/ci-10-2016-0051
Hietajärvi, A.-M., & Aaltonen, K. (2018). The formation of a collaborative project identity in an infrastructure alliance project. Construction Management and Economics, 36(1), 1–21. https://doi.org/10.1080/01446193.2017.1315149
Hosseinian, S. M., & Carmichael, D. G. (2013). Optimal gainshare/painshare in alliance projects. Journal of the Operational Research Society, 64(8), 1269–1278. https://doi.org/10.1057/jors.2012.146
Humphreys, P., Matthews, J., & Kumaraswamy, M. (2003). Preconstruction project partnering: From adversarial to collaborative relationships. Supply Chain Management: An International Journal, 8(2), 166–178. https://doi.org/10.1108/13598540310468760
Johnson, T. R., Feng, P., Sitzabee, W., & Jernigan, M. (2013). Federal acquisition regulation applied to alliancing contract practices. Journal of Construction Engineering and Management, 139(5), 480–487. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000592
Kadefors, A., Björlingson, E., & Karlsson, A. (2007). Procuring service innovations: Contractor selection for partnering projects. International Journal of Project Management, 25(4), 375–385. https://doi.org/10.1016/j.ijproman.2007.01.003
Kantola, M., & Saari, A. (2016). Project delivery systems for nZEB projects. Facilities, 34(1/2), 85–100. https://doi.org/10.1108/F-03-2014-0025
Ke, Y., Ling, F. Y. Y., & Zou, P. X. W. (2015). Effects of contract strategy on interpersonal relations and project outcomes of public-sector construction contracts in Australia. Journal of Management in Engineering, 31(4), 04014062. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000273
Keniger, M., & Walker, D. H. T. (2002). Quality management in construction: An innovative advance using project alliancing in Australia. The TQM Magazine, 14(5), 307–317. https://doi.org/10.1108/09544780210439743
Kokkonen, A., & Vaagaasar, A. L. (2018). Managing collaborative space in multi-partner projects. Construction Management and Economics, 36(2), 83–95. https://doi.org/10.1080/01446193.2017.1347268
Kraatz, J. A., Sanchez, A. X., & Hampson, K. D. (2014). Digital modeling, integrated project delivery and industry transformation: An Australian case study. Buildings, 4(3), 453–466. https://doi.org/10.3390/buildings4030453
Krebs, J. E., & Epstein, A. J. (1996). Project controls within a partnering agreement. In Transactions of 40th AACE International Annual Meeting. Vancouver, Canada.
Kumaraswamy, M. M., Rahman, M. M., Ling, F. Y., & Phng, S. T. (2005). Reconstructing cultures for relational contracting. Journal of Construction Engineering and Management, 131(10), 1065–1075. https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1065)
Kwofie, T. E., Aigbavboa, C. O., & Matsane, Z. S.-S. (2017). Collaborative practices in South African construction project delivery. International Journal of Construction Supply Chain Management, 7(2), 39–55.
Laan, A., Noorderhaven, N., Voordijk, H., & Dewulf, G. (2011a). Building trust in construction partnering projects: An exploratory case-study. Journal of Purchasing and Supply Management, 17(2), 98–108. https://doi.org/10.1016/j.pursup.2010.11.001
Laan, A., Voordijk, H., & Dewulf, G. (2011b). Reducing opportunistic behaviour through a project alliance. International Journal of Managing Projects in Business, 4(4), 660–679. https://doi.org/10.1108/17538371111164065
Lahdenperä, P. (2010). Conceptualizing a two‐stage target‐cost arrangement for competitive cooperation. Construction Management and Economics, 28(7), 783–796. "https://doi.org/10.1080/01446193.2010.487534
Lahdenperä, P. (2012). Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), 57–79. https://doi.org/10.1080/01446193.2011.648947
Lahdenperä, P. (2017). Towards a coherent theory of project Alliancing: Discovering the system’s complex mechanisms yielding value for money. Construction Economics and Building, 17(2), 41–61. https://doi.org/10.5130/ajceb.v17i2.5292
Larson, E. W. (1995). Project partnering: Results of study of 280 construction projects. Journal of Management in Engineering, 11(2), 30–35. https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(30)
Larson, E. W. (1997). Partnering on construction projects: A study of the relationship between partnering activities and project success. IEEE Transactions on Engineering Management, 44(2), 188–195. https://doi.org/10.1109/17.584926
Larson, E. W., & Gray, C. (1994). Project partnering in the construction industry: The wave of the future? National Productivity Review, 14(1), 15–24. https://doi.org/10.1002/npr.4040140104
Lazar, F. D. (2000). Project partnering: Improving the likelihood of win/win outcomes. Journal of Management in Engineering, 16(2), 71–83. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:2(71)
Levac, D., Colquhoun, H., & O’Brien, K. K. (2010). Scoping studies: advancing the methodology. Implementation Science, 5(1), 69. https://doi.org/10.1186/1748-5908-5-69
Li, H., Cheng, E. W. L., Love, P. E. D., & Irani, Z. (2001). Co-operative benchmarking: A tool for partnering excellence in construction. International Journal of Project Management, 19(3), 171–179. https://doi.org/10.1016/S0263-7863(99)00033-2
Ling, F. Y. Y., Ke, Y., Kumaraswamy, M. M., & Wang, S. (2014). Key relational contracting practices affecting performance of public construction projects in China. Journal of Construction Engineering and Management, 140(1), 04013034. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000781
Ling, F. Y. Y., Rahman, M. M., & Ng, T. L. (2006). Incorporating contractual incentives to facilitate relational contracting. Journal of Professional Issues in Engineering Education and Practice, 132(1), 57–66. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:1(57)
Ling, F. Y. Y., Tan, P. C., Ning, Y., Teo, A., & Gunawansa, A. (2015). Effect of adoption of relational contracting practices on relationship quality in public projects in Singapore. Engineering, Construction and Architectural Management, 22(2), 169–189. https://doi.org/10.1108/ECAM-10-2013-0093
Liu, B., Huo, T., Liang, Y., Sun, Y., & Hu, X. (2016). Key factors of project characteristics affecting project delivery system decision making in the Chinese construction industry: Case study using Chinese data based on rough set theory. Journal of Professional Issues in Engineering Education and Practice, 142(4), 05016003. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000278
Liu, B., Huo, T., Meng, J., Gong, J., Shen, Q., & Sun, T. (2015). Identification of key contractor characteristic factors that affect project success under different project delivery systems: Empirical analysis based on a group of data from China. Journal of Management in Engineering, 32(1), 05015003. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000388
Liu, B., Huo, T., Shen, Q., Yang, Z., Meng, J., & Xue, B. (2014). Which owner characteristics are key factors affecting project delivery system decision making? Empirical analysis based on the rough set theory. Journal of Management in Engineering, 31(4), 05014018. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000298
Liu, B., Xue, B., Huo, T., Shen, G., & Fu, M. (2019). Project external environmental factors affecting project delivery systems selection. Journal of Civil Engineering and Management, 25(3), 276–286. https://doi.org/10.3846/jcem.2019.7460
Lloyd-Walker, B. M., Mills, A. J., & Walker, D. H. T. (2014). Enabling construction innovation: the role of a no-blame culture as a collaboration behavioural driver in project alliances. Construction Management and Economics, 32(3), 229–245. https://doi.org/10.1080/01446193.2014.892629
Lohne, J. (2017). Ethical behaviour in the design phase of AEC projects. International Journal of Managing Projects in Business, 10(2), 330–345. https://doi.org/10.1108/IJMPB-06-2016-0049
Lohne, J., Kjesbu, N. E., Engebø, A., Young, B., & Lædre, O. (2019). Scoping literature review of crime in the AEC industry. Journal of Construction Engineering and Management, 145(6), 03119002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001648
Love, P. E. D., Gunasekaran, A., & Li, H. (1998a). Concurrent engineering: A strategy for procuring construction projects. International Journal of Project Management, 16(6), 375–383. https://doi.org/10.1016/s0263-7863(97)00066-5
Love, P. E. D., Mistry, D., & Davis, P. R. (2010). Price competitive alliance projects: Identification of success factors for public clients. Journal of Construction Engineering and Management, 136(9), 947–956. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000208
Love, P. E. D., Skitmore, M., & Earl, G. (1998b). Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(2), 221–233. https://doi.org/10.1080/014461998372501
Lu, S., & Yan, H. (2007a). An empirical study on incentives of strategic partnering in China: Views from construction companies. International Journal of Project Management, 25(3), 241–249. https://doi.org/10.1016/j.ijproman.2006.08.004
Lu, S., & Yan, H. (2007b). A model for evaluating the applicability of partnering in construction. International Journal of Project Management, 25(2), 164–170. https://doi.org/10.1016/j.ijproman.2006.09.009
Lædre, O., Austeng, K., Haugen, T. I., & Klakegg, O. J. (2006). Procurement routes in public building and construction projects. Journal of Construction Engineering and Management, 132(7), 689–696. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(689)
Ma, Z., Zhang, D., & Li, J. (2018). A dedicated collaboration platform for Integrated Project Delivery. Automation in Construction, 86, 199–209. https://doi.org/10.1016/j.autcon.2017.10.024
MacDonald, C., Walker, D. H. T., & Moussa, N. (2013). Towards a project alliance value for money framework. Facilities, 31(5/6), 279–309. https://doi.org/10.1108/02632771311307179
Mafakheri, F., Dai, L., Slezak, D., & Nasiri, F. (2007). Project delivery system selection under uncertainty: Multicriteria multilevel decision aid model. Journal of Management in Engineering, 23(4), 200–206. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:4(200)
Manley, K. (2002). Partnering and alliancing on road projects in Australia and internationally. Road and Transport Research: A Journal of Australian and New Zealand Research and Practice, 11(3), 46–60.
Manley, T. R., Shaw, W. H., & Manley, R. C. (2007). Project partnering: A medium for private and public sector collaboration. Engineering Management Journal, 19(2), 3–11. https://doi.org/10.1080/10429247.2007.11431726
Mason, J. R. (2007). The views and experiences of specialist contractors on partnering in the UK. Construction Management and Economics, 25(5), 519–527. https://doi.org/10.1080/01446190701326828
Matthews, O., & Howell, G. A. (2005). Integrated project delivery an example of relational contracting. Lean Construction Journal, 2(1), 46–61.
Mejlænder-Larsen, Ø. (2018). Improving collaboration between engineering and construction in detail engineering using a project execution model and BIM. Journal of Information Technology in Construction (ITcon), 23(16), 324–339.
Mesa, H. A., Molenaar, K. R., & Alarcón, L. F. (2016). Exploring performance of the integrated project delivery process on complex building projects. International Journal of Project Management, 34(7), 1089–1101. https://doi.org/10.1016/j.ijproman.2016.05.007
Migliaccio, G. C., Edward Gibson, G. Jr., & O’Connor, J. T. (2008). Changing project delivery strategy. Public Works Management & Policy, 12(3), 483–502. https://doi.org/10.1177/1087724X07311805
Miller, J. B., Garvin, M., J., Ibbs, C. W., & Mahoney, S. E. (2000). Toward a new paradigm: Simultaneous use of multiple project delivery methods. Journal of Management in Engineering, 16(3), 58–67. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:3(58)
Mollaoglu-Korkmaz, S., Swarup, L., & Riley, D. (2011). Delivering sustainable, high-performance buildings: Influence of project delivery methods on integration and project outcomes. Journal of Management in Engineering, 29(1), 71–78. https://doi.org/10.1061/(asce)me.1943-5479.0000114
Mollaoglu, S., Sparkling, A., & Thomas, S. (2015). An inquiry to move an underutilized best practice forward: Barriers to partnering in the architecture, engineering, and construction industry. Project Management Journal, 46(1), 69–83. https://doi.org/10.1002/pmj.21469
Mostafavi, A., & Karamouz, M. (2010). Selecting appropriate project delivery system: Fuzzy approach with risk analysis. Journal of Construction Engineering and Management, 136(8), 923–930. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000190
Nanda, U., Rybkowski, Z. K., Pati, S., & Nejati, A. (2017). A value analysis of lean processes in target value design and integrated project delivery: Stakeholder perception. HERD: Health Environments Research & Design Journal, 10(3), 99–115. https://doi.org/10.1177/1937586716670148
Naoum, S. (2003). An overview into the concept of partnering. International Journal of Project Management, 21(1), 71–76. https://doi.org/10.1016/S0263-7863(01)00059-X
Naoum, S., & Egbu, C. (2015). Critical review of procurement method research in construction journals. Procedia Economics and Finance, 21(Suppl. C), 6–13. https://doi.org/10.1016/S2212-5671(15)00144-6
Nejati, I., Javidruzi, M., & Mohebifar, A. H. (2014). Feasibility of using an Integrated Project Delivery (IPD) in mass housing collaborative projects. Advances in Environmental Biology, 8, 211–218.
Ng, S. T., Rose, T. M., Mak, M., & Chen, S. E. (2002). Problematic issues associated with project partnering – the contractor perspective. International Journal of Project Management, 20(6), 437–449. https://doi.org/10.1016/S0263-7863(01)00025-4
Nida, A., Youngcheol, K., & Irtishad, A. (2015). Critical look into the relationship between information and communication technology and integrated project delivery in public sector construction. Journal of Management in Engineering, 31(5), 04014091. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000334
Ning, Y., & Ling, F. Y. Y. (2015). The effects of project characteristics on adopting relational transaction strategies. International Journal of Project Management, 33(5), 998–1007. https://doi.org/10.1016/j.ijproman.2014.12.006
O’Donnell, N., Kappen, D. L., Fitz-Walter, Z., Deterding, S., Nacke, L. E., & Johnson, D. (2017). How multidisciplinary is gamification research? Results from a scoping review. In CHI PLAY’17 Extended Abstracts. The ACM SIGCHI Annual Symposium on Computer-Human Interaction in Play (pp. 445–452). Association for Computing Machinery (ACM). https://doi.org/10.1145/3130859.3131412
Oakland, J., & Marosszeky, M. (2017). Total construction management: Lean quality in construction project delivery. Routledge. https://doi.org/10.4324/9781315694351
Osama, A. (1994). Partnering: A team building approach to quality construction management. Journal of Management in Engineering, 10(6), 26–29. https://doi.org/10.1061/(ASCE)9742-597X(1994)10:6(26)
Osman, W. N., Mohd Nawi, M. N., Anuar, H. S., Radzuan, K., & Osman, N. (2015). Readiness assessment for implementation of Integrated Project Delivery (IPD) in Industrialized Building System (IBS). Jurnal Teknologi, 77(4), 91–95. https://doi.org/10.11113/jt.v77.6046
Osman, W. N., Nawi, M. N. M., Zulhumadi, F., Shafie, M. W. M., & Ibrahim, F. A. (2017). Individual readiness of construction stakeholders to implement integrated project delivery (IPD). Journal of Engineering Science and Technology, 12, 229–238.
Oyetunji, A., & Anderson, S. (2001). Owner’s tool for project delivery and contract strategy selection: User’s guide. Construction Industry Institute.
Packham, G., Thomas, B., & Miller, C. (2003). Partnering in the house building sector: A subcontractor’s view. International Journal of Project Management, 21(5), 327–332. https://doi.org/10.1016/S0263-7863(02)00046-7
Paolillo, W., Olson, B. V., & Straub, E. (2016). People centered innovation: Enabling lean integrated project delivery and disrupting the construction industry for a more sustainable future. Journal of Construction Engineering, Article ID 3704289. https://doi.org/10.1155/2016/3704289
Peña-Mora, F., & Harpoth, N. (2001). Effective partnering in innovative procured multicultural project. Journal of Management in Engineering, 17(1), 2–13. https://doi.org/10.1061/(asce)0742-597x(2001)17:1(2)
Pishdad-Bozorgi, P. (2017). Case studies on the role of integrated project delivery (IPD) approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), 102–124. https://doi.org/10.1080/15578771.2016.1226213
Pishdad-Bozorgi, P., & Beliveau, Y. J. (2016a). A schema of trust building Attributes and their corresponding integrated project delivery traits. International Journal of Construction Education and Research, 12(2), 142–160. https://doi.org/10.1080/15578771.2015.1118171
Pishdad-Bozorgi, P., & Beliveau, Y. J. (2016b). Symbiotic relationships between integrated project delivery (IPD) and trust. International Journal of Construction Education and Research, 12(3), 179–192. https://doi.org/10.1080/15578771.2015.1118170
Rahman, M. M., & Kumaraswamy, M. M. (2002). Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(1), 45–54. https://doi.org/10.1080/01446190110089682
Rahman, M. M., & Kumaraswamy, M. M. (2004). Contracting relationship trends and transitions. Journal of Management in Engineering, 20(4), 147–161. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:4(147)
Rahman, M. M., & Kumaraswamy, M. M. (2005). Relational selection for collaborative working arrangements. Journal of Construction Engineering and Management, 131(10), 1087–1098. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:10(1087)
Rahman, M. M., & Kumaraswamy, M. M. (2008). Relational contracting and teambuilding: Assessing potential contractual and noncontractual incentives. Journal of Management in Engineering, 24(1), 48–63. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:1(48)
Rahman, M. M., & Kumaraswamy, M. M. (2012). Multicountry perspectives of relational contracting and integrated project teams. Journal of Construction Engineering and Management, 138(4), 469–480. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000463
Rahman, M. M., Kumaraswamy, M. M., & Ling, F. Y. Y. (2007). Building a relational contracting culture and integrated teams. Canadian Journal of Civil Engineering, 34(1), 75–88. https://doi.org/10.1139/l06-119
Rahmani, F., Khalfan, M., & Maqsood, T. (2016). Lessons learnt from the use of relationship-based procurement methods in Australia: Clients’ perspectives. Construction Economics and Building, 16(2), 1–13. https://doi.org/10.5130/ajceb.v16i2.4634
Rowlinson, S. (2017). Building information modelling, integrated project delivery and all that. Construction Innovation, 17(1), 45–49. https://doi.org/10.1108/CI-05-2016-0025
Rwelamila, P., Talukhaba, A., & Ngowi, A. (2000). Project procurement systems in the attainment of sustainable construction. Sustainable Development, 8(1), 39–50. https://doi.org/10.1002/(SICI)1099-1719(200002)8:1<39::AID-SD127>3.0.CO;2-Z
Sakal, M. W. (2005). Project alliancing: A relational contracting mechanism for dynamic projects. Lean Construction Journal, 2(1), 67–79.
Sarkar, D. (2015). A framework for development of Lean Integrated Project Delivery Model for infrastructure road projects. International Journal of Civil and Structural Engineering, 5(3), 261–271.
Sarkar, D., & Mangrola, M. (2016). Development of lean integrated project delivery model for highway projects. International Journal of Construction Project Management, 8(1), 25–42.
Simonsen, S. H. F., Skoglund, M. H., Engebø, A., Varegg, B. E., & Lædre, O. (2019). Effects of IPD in Norway – A case study of the Tønsberg project. In 27th Annual Conference of the International Group for Lean Construction (IGLC). Dublin, Ireland. https://doi.org/10.24928/2019/0157
Sullivan, J., Asmar, M. E., Chalhoub, J., & Obeid, H. (2017). Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6), 04017009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001282
Sun, W., Mollaoglu, S., Miller, V., & Manata, B. (2015). Communication behaviors to implement innovations: How do AEC teams communicate in IPD projects? Project Management Journal, 46(1), 84–96. https://doi.org/10.1002/pmj.21478
Söderlund, J. (2011). Theoretical foundations of project management: Suggestions for a pluralistic understanding. In P. W. G. Morris, J. Pinto, & J. Söderlund (Eds.), The Oxford handbook of project management. Oxford University Press. https://doi.org/10.1093/oxfordhb/9780199563142.003.0003
Swan, W., & Khalfan, M. M. A. (2007). Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(2), 119–130. https://doi.org/10.1108/09699980710731254
Touran, A., Gransberg, D. D., Molenaar, K. R., & Ghavamifar, K. (2011). Selection of project delivery method in transit: Drivers and objectives. Journal of Management in Engineering, 27(1), 21–27. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000027
Tran, D. Q., & Molenaar, K. R. (2015). Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12), 04015041. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001024
van de Velde, D., & Ernst, F. (2008). Provision and management of dedicated railway systems: how to arrange competition. In H. Priemus, B. Flyvbjerg, & B. Van Wee (Eds.), Decisionmaking on mega-projects: Cost-benefit analysis, planning and innovation (Transport economics, management, and policy (pp. 263). Edward Elgar Pub. https://doi.org/10.4337/9781848440173.000211
Vee, C., & Skitmore, C. (2003). Professional ethics in the construction industry. Engineering, Construction and Architectural Management, 10(2), 117–127. https://doi.org/10.1108/09699980310466596
Vilasini, N., Neitzert, T., & Rotimi, J. (2014). Developing and evaluating a framework for process improvement in an alliance project: A New Zealand case study. Construction Management and Economics, 32(6), 625–640. https://doi.org/10.1080/01446193.2013.874565
Walker, D. H. T. (2002). Enthusiasm, commitment and project alliancing: An Australian experience. Construction Innovation, 2(1), 15–31. https://doi.org/10.1108/14714170210814667
Walker, D. H. T., & Lloyd-Walker, B. M. (2015). Collaborative project procurement arrangements. Project Management Institute, Inc.
Walker, D. H. T., Hampson, K., & Peters, R. (2002). Project alliancing vs project partnering: A case study of the Australian National Museum project. Supply Chain Management: An International Journal, 7(2), 83–91. https://doi.org/10.1108/13598540210425830
Walker, D. H. T., Harley, J., & Mills, A. (2015). Performance of project alliancing in Australasia: A digest of infrastructure development from 2008 to 2013. Construction Economics and Building, 15(1), 1–18. https://doi.org/10.5130/ajceb.v15i1.4186
Walker, D. H. T., Peters, R., Hampson, K. D., & Thompson, M. (2001). Achieving a responsive industrial relations environment for construction industry workers: A project alliancing case study. Construction Innovation, 1(4), 211–225. https://doi.org/10.1108/14714170110814613
Wang, T., Tang, W., Du, L., Duffield, C. F., & Wei, Y. (2016). Relationships among risk management, partnering, and contractor capability in international EPC project delivery. Journal of Management in Engineering, 32(6), 04016017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000459
Wardani, M. A. E., Messner, J. I., & Horman, M. J. (2006). Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), 230–238. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(230)
Wearne, S. H. (1989). Control of engineering projects (Vol. 6). Thomas Telford. https://doi.org/10.1680/coep.13872
Weston, D. C., & Gibson, G. E. (1993). Partnering-project performance in U.S. Army Corps of Engineers. Journal of Management in Engineering, 9(4), 410–425. https://doi.org/10.1061/(ASCE)9742-597X(1993)9:4(410)
William, I., & Ying‐Yi, C. (2011). Alternative methods for choosing an appropriate project delivery system (PDS). Facilities, 29(13/14), 527–541. https://doi.org/10.1108/02632771111178418
Williams, T. M. (1999). The need for new paradigms for complex projects. International Journal of Project Management, 17(5), 269–273. https://doi.org/10.1016/S0263-7863(98)00047-7
Wood, G. D., & Ellis, R. C. T. (2005). Main contractor experiences of partnering relationships on UK construction projects. Construction Management and Economics, 23(3), 317–325. https://doi.org/10.1080/0144619042000287714
Xie, H., & Liu, H. (2017). Studying contract provisions of shared responsibilities for integrated project delivery under national and international standard forms. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(3), 04517009. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000220
Yates, J. K., & Duran, J. (2006). Utilizing dispute review boards in relational contracting: A case study. Journal of Professional Issues in Engineering Education and Practice, 132(4), 334–341. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:4(334)
Yates, J. K., & Epstein, A. (2006). Avoiding and minimizing construction delay claim disputes in relational contracting. Journal of Professional Issues in Engineering Education and Practice, 132(2), 168–179. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:2(168)
Yeung, J. F. Y., Chan, A. P. C., & Chan, D. W. M. (2007). The definition of alliancing in construction as a Wittgenstein family-resemblance concept. International Journal of Project Management, 25(3), 219–231. https://doi.org/10.1016/j.ijproman.2006.10.003
Yeung, J. F. Y., Chan, A. P., & Chan, D. W. (2012). Defining relational contracting from the Wittgenstein family-resemblance philosophy. International Journal of Project Management, 30(2), 225–239. https://doi.org/10.1016/j.ijproman.2011.06.002
Yitmen, I. (2013). Organizational cultural intelligence: A competitive capability for strategic alliances in the international construction Industry. Project Management Journal, 44(4), 5–25. https://doi.org/10.1002/pmj.21356
Zhang, L.-Y., Cheng, J., & Fan, W. (2016). Party selection for integrated project delivery based on interorganizational transactive memory system. Journal of Construction Engineering and Management, 142(3), 04015089. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001068
Zhang, L.-Y., He, J., & Zhou, S. (2012). Sharing tacit knowledge for integrated project team flexibility: Case study of integrated project delivery. Journal of Construction Engineering and Management, 139(7), 795–804. https://doi.org/10.1061/(asce)co.1943-7862.0000645
Zhang, L.-Y., & Li, F. (2015). The impact of risk perception on developing incentive systems for relational contracting. KSCE Journal of Civil Engineering, 19(5), 1203–1213. https://doi.org/10.1007/s12205-013-0450-6
Zhang, L.-Y., Li, Y., & Wu, Q. (2013). Evaluation on collaborative satisfaction for project management team in integrated project delivery mode. Journal of The Institution of Engineers (India): Series A, 94(2), 109–115. https://doi.org/10.1007/s40030-013-0041-z
Zou, J., & Zillante, G. (2012). Relationship contracting: The South Australian experience – A case study. Construction Economics and Building, 6(2), 20–31. https://doi.org/10.5130/ajceb.v6i2.2981