A model to reduce earthmoving impacts
Abstract
Meeting increasingly ambitious carbon regulations in the construction industry is particularly challenging for earthmoving operations due to the extensive use of heavy-duty diesel equipment. Better planning of operations and balancing of competing demands linked to environmental concerns, costs, and duration is needed. However, existing approaches (theoretical and practical) rarely address all of these demands simultaneously, and are often limited to parts of the process, such as earth allocation methods or equipment allocation methods based on practitioners’ past experience or goals. Thus, this study proposes a method that can integrate multiple planning techniques to maximize mitigation of project impacts cost-effectively, including the noted approaches together with others developed to facilitate effective decision-making. The model is adapted for planners and contractors to optimize mass flows and allocate earthmoving equipment configurations with respect to tradeoffs between duration, cost, CO2 emissions, and energy use. Three equipment allocation approaches are proposed and demonstrated in a case study. A rule-based approach that allocates equipment configurations according to hauling distances provided the best-performing approach in terms of costs, CO2 emissions, energy use and simplicity (which facilitates practical application at construction sites). The study also indicates that trucks are major contributors to earthmoving operations’ costs and environmental impacts.
Keyword : earthmoving operations, optimization framework, optimum configuration, tradeoff duration, cost, emissions
This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Ahn, C., Martinez, J. C., Rekapalli, P. V., & Peña-Mora, F. A. (2009). Sustainability analysis of earthmoving operations. In Proceedings of the 2009 Winter Simulation Conference (WSC), Austin, TX, USA. https://doi.org/10.1109/WSC.2009.5429656
Ahn, C., Xie, H., Lee, S., Abourizk, S., & Peña-Mora, F. (2010). Carbon footprints analysis for tunnel construction processes in the preplanning phase using collaborative simulation. In Construction Research Congress 2010: Innovation for Reshaping Construction Practice. https://doi.org/10.1061/41109(373)154
Akadiri, P. O., Chinyio, E. A., & Olomolaiye, P. O. (2012). Design of a sustainable building: A conceptual framework for implementing sustainability in the building sector. Buildings, 2(2), 126–152. https://doi.org/10.3390/buildings2020126
Ang, A. H. S., & Tang, W. H. (1984). Probability concepts in engineering planning and design. Vol. 2: Decision, risk, and reliability. John Wiley & Sons.
Ariaratnam, S. T., Piratla, K., Cohen, A., & Olson, M. (2013). Quantification of sustainability index for underground utility infrastructure projects. Journal of Construction Engineering and Management, 139(12), A4013002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000763
Avetisyan, H. G., Miller-Hooks, E., & Melanta, S. (2011). Decision models to support greenhouse gas emissions reduction from transportation construction projects. Journal of Construction Engineering and Management, 138(5), 631–641. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000477
Bogenberger, C., Dell’Amico, M., Fuellerer, G., Hoefinger, G., Iori, M., Novellani, S., & Panicucci, B. (2015). Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6), 05015003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000973
Carmichael, D. G., Bartlett, B. J., & Kaboli, A. S. (2014). Surface mining operations: coincident unit cost and emissions. International Journal of Mining, Reclamation and Environment, 28(1), 47–65. https://doi.org/10.1080/17480930.2013.772699
Carmichael, D. G., & Mustaffa, N. K. (2018). Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(2). https://doi.org/10.1108/CI-05-2017-0047
Carmichael, D. G., Mustaffa, N. K., & Shen, X. (2018). A utility measure of attitudes to lower-emissions production in construction. Journal of Cleaner Production, 202, 23–32. https://doi.org/10.1016/j.jclepro.2018.08.086
Carmichael, D. G., Shen, X., & Peansupap, V. (2019). The relationship between heavy equipment cost efficiency and cleaner production in construction. Journal of Cleaner Production, 211, 521–529. https://doi.org/10.1016/j.jclepro.2018.11.167
Ciscar, J. C., Iglesias, A., Feyen, L., Szabó, L., Van Regemorter, D., Amelung, B., Nicholls, R., Watkiss, P., Christensen, O. B., Dankers, R., & Garrote, L. (2011). Physical and economic consequences of climate change in Europe. Proceedings of the National Academy of Sciences of the United States of America, 108(7), 2678–2683. https://doi.org/10.1073/pnas.1011612108
Clement, R. T. (1991). Making hard decisions: An introduction to decision analysis. Plus-Kent Publishing Company.
Deb, K. (2001). Multi-objective optimization using evolutionary algorithms. John Wiley & Sons.
Dongier, P., & Lovei, L. (2006). Infrastructure at the crossroads: lessons from 20 years of World Bank experience. The World Bank Group.
European Commission. (2003). Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 Establishing a scheme for greenhouse gas emission allowance trading within the community and amending Council Directive 96/61/EC. https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32003L0087
Fonseca, C. M., & Fleming, P. J. (1993). Genetic algorithms for multiobjective optimization: Formulation discussion and generalization. In Genetic Algorithms: Proceedings of the Fifth International Conference (pp. 416–423). Morgan Kaufmann.
Fordham, D. A., Resit Akçakaya, H., Araújo, M. B., Elith, J., Keith, D. A., Pearson, R., Auld, T. D., Mellin, C., Morgan, J. W., Regan, T. J., & Tozer, M. (2012). Plant extinction risk under climate change: are forecast range shifts alone a good indicator of species vulnerability to global warming? Global Change Biology, 18(4), 1357–1371. https://doi.org/10.1111/j.1365-2486.2011.02614.x
Frey, H. C., Rasdorf, W., & Lewis, P. (2010). Comprehensive field study of fuel use and emissions of nonroad diesel construction equipment. Transportation Research Record: Journal of the Transportation Research Board, 2158(1), 69–76. https://doi.org/10.3141/2158-09
Goh, C. K., Tan, K. C., Liu, D., & Chiam, S. C. (2010). A competitive and cooperative co-evolutionary approach to multiobjective particle swarm optimization algorithm design. European Journal of Operational Research, 202(1), 42–54. https://doi.org/10.1016/j.ejor.2009.05.005
González, V., & Echaveguren, T. (2012). Exploring the environmental modeling of road construction operations using discrete-event simulation. Automation in Construction, 24, 100–110. https://doi.org/10.1016/j.autcon.2012.02.011
Grann, H. (1997). The industrial symbiosis at Kalundborg, Denmark. In The industrial green game. Implications for environmental design and management (pp. 117–123). National Academy Press.
Gwak, H., Seo, J., & Lee, D. (2018). Optimal cut-fill pairing and sequencing method in earthwork operation. Automation in Construction, 87, 60–73. https://doi.org/10.1016/j.autcon.2017.12.010
Horn, J., Nafpliotis, N., & Goldberg, D. E. (1994). A niched Pareto genetic algorithm for multiobjective optimization. In Proceedings of the First IEEE Conference on Evolutionary Computation. IEEE World Congress on Computational Intelligence. Orlando, FL, USA. https://doi.org/10.1109/ICEC.1994.350037
Hunkeler, D., & Rebitzer, G. (2005). The future of life cycle assessment. The International Journal of Life Cycle Assessment, 10(5), 305–308. https://doi.org/10.1065/lca2005.09.001
Jacobsson, M., & Linderoth, H. C. (2010). The influence of contextual elements, actors’ frames of reference, and technology on the adoption and use of ICT in construction projects: a Swedish case study. Construction Management and Economics, 28(1), 13–23. https://doi.org/10.1080/01446190903406154
Jassim, H., Lu, W., & Olofsson, T. (2017). Predicting energy consumption and CO2 emissions of excavators in earthwork operations: an artificial neural network model. Sustainability, 9(7), 1257. https://doi.org/10.3390/su9071257
Jassim, H. S., Lu, W., & Olofsson, T. (2018a). Assessing energy consumption and carbon dioxide emissions of off-highway trucks in earthwork operations: An artificial neural network model. Journal of Cleaner Production, 198, 364–380. https://doi.org/10.1016/j.jclepro.2018.07.002
Jassim, H. S., Lu, W., & Olofsson, T. (2018b). Quantification of energy consumption and carbon dioxide emissions during excavator operations. In I. Smith, & B. Domer (Eds.), Lecture Notes in Computer Science: Vol. 10863. Advanced Computing Strategies for Engineering. EG-ICE 2018. Springer. https://doi.org/10.1007/978-3-319-91635-4_22
Jassim, H. S., Lu, W., & Olofsson, T. (2019). Determining the environmental impact of material hauling with wheel loaders during earthmoving operations. Journal of the Air & Waste Management Association, 69(10), 1195–1214. https://doi.org/10.1080/10962247.2019.1640805
Jukic, D., & Carmichael, D. G. (2016). Emission and cost effects of training for construction equipment operators: a field study. Smart and Sustainable Built Environment, 5(2), 96–110. https://doi.org/10.1108/SASBE-11-2015-0040
Kaboli, A. S., & Carmichael, D. G. (2014). Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), 170–186. https://doi.org/10.1108/SASBE-10-2013-0050
Karimi, M. S., Mousavi, S. J., Kaveh, A., & Afshar, A. (2007). Fuzzy optimization model for earthwork allocations with imprecise parameters. Journal of Construction Engineering and Management, 133(2), 181–190. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(181)
Keeney, R. L., & Raiffa, H. (1993). Decisions with multiple objectives: preferences and value trade-offs. Cambridge University Press. https://doi.org/10.1017/CBO9781139174084
Kennedy, J., & Eberhart, R. C. (1995). Particle swarm optimization. In Proceedings of IEEE International Conference on Neural Networks (pp. 1942–1948). https://doi.org/10.1109/ICNN.1995.488968
Kim, B., & Kim, Y. (2016). Configuration of earthwork equipment considering environmental impacts, cost and schedule. Journal of Civil Engineering and Management, 22(1), 73–85. https://doi.org/10.3846/13923730.2014.897964
Kim, B., Lee, H., Park, H., & Kim, H. (2011). Greenhouse gas emissions from onsite equipment usage in road construction. Journal of Construction Engineering and Management, 138(8), 982–990. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000515
Kim, B., Lee, H., Park, H., & Kim, H. (2012). Estimation of greenhouse gas emissions from land-use changes due to road construction in the Republic of Korea. Journal of Construction Engineering and Management, 139(3), 339–346. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000620
Klanfar, M., Korman, T., & Kujundžić, T. (2016). Fuel consumption and engine load factors of equipment in quarrying of crushed stone. Tehnički vjesnik/Technical Gazette, 23(1), 163–169. https://doi.org/10.17559/TV-20141027115647
Konak, A., Coit, D. W., & Smith, A. E. (2006). Multi-objective optimization using genetic algorithms: A tutorial. Reliability Engineering & System Safety, 91(9), 992–1007. https://doi.org/10.1016/j.ress.2005.11.018
Krantz, J., Feng, K., Larsson, J., & Olofsson, T. (2019). ‘Eco-Hauling’ principles to reduce carbon emissions and the costs of earthmoving – A case study. Journal of Cleaner Production, 208, 479–489. https://doi.org/10.1016/j.jclepro.2018.10.113
Kubsh, J. (2017). Diesel retrofit technologies and experience for on-road and off-road vehicles. International Council on Clean Transportation (ICCT). https://theicct.org/sites/default/files/publications/Diesel-Retrofits_ICCT_ConsultantReport_13062017_vF.pdf
Lajunen, A., Sainio, P., Laurila, L., Pippuri-Mäkeläinen, J., & Tammi, K. (2018). Overview of powertrain electrification and future scenarios for non-road mobile machinery. Energies, 11(5), 1184. https://doi.org/10.3390/en11051184
Lavin, A. (2015). A Pareto front-based multiobjective path planning algorithm. arXiv preprint, arXiv:1505.05947.
Lewis, P., Leming, M., Frey, H. C., & Rasdorf, W. (2011). Assessing effects of operational efficiency on pollutant emissions of nonroad diesel construction equipment. Transportation Research Record: Journal of the Transportation Research Board, 2233(1), 11–18. https://doi.org/10.3141/2233-02
Li, D., & Lu, M. (2016). Automated generation of work breakdown structure and project network model for earthworks project planning: a flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1), 04016086. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001214
Li, H., & Lei, Z. (2010). Implementation of Discrete-Event Simulation (DES) in estimating & analyzing CO 2 emission during earthwork of building construction engineering. In 2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management. Xiamen, China. https://doi.org/10.1109/ICIEEM.2010.5646619
Lin, B., & Li, X. (2011). The effect of carbon tax on per capita CO2 emissions. Energy Policy, 39(9), 5137–5146. https://doi.org/10.1016/j.enpol.2011.05.050
Liu, C., An, X., Ahn, C. R., & Lee, S. (2013). Integrated evaluation of cost, schedule and emission performance on rockfilled concrete dam construction operation using discrete event simulation. In Proceedings of the 2013 Winter Simulation Conference: Simulation: Making Decisions in a Complex World. Washington, DC, USA. https://doi.org/10.1109/WSC.2013.6721678
Love, B. J., & Nejadhashemi, A. P. (2011). Water quality impact assessment of large-scale biofuel crops expansion in agricultural regions of Michigan. Biomass Bioenergy, 35(5), 2200–2216. https://doi.org/10.1016/j.biombioe.2011.02.041
Marshall, S. K., Rasdorf, W., Lewis, P., & Frey, H. C. (2012). Methodology for estimating emissions inventories for commercial building projects. Journal of Architectural Engineering, 18(3), 251–260. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000073
Marzouk, M., & Moselhi, O. (2003). A decision support tool for construction bidding. Construction Innovation, 3(2), 111–124. https://doi.org/10.1108/14714170310814882
Marzouk, M., & Moselhi, O. (2004). Multiobjective optimization of earthmoving operations. Journal of Construction Engineering and Management, 130(1), 105–113. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(105)
Mawdesley, M., A-Jibouri, S., Askew, W., & Patterson, D. (2002). A model for the automated generation of earthwork planning activities. Construction Innovation, 2(4), 249–268. https://doi.org/10.1108/14714170210814793
McMichael, A. J., Woodruff, R. E., & Hales, S. (2006). Climate change and human health: present and future risks. The Lancet, 367, 859–869. https://doi.org/10.1016/S0140-6736(06)68079-3
Melanta, S., Miller-Hooks, E., & Avetisyan, H. G. (2012). Carbon footprint estimation tool for transportation construction projects. Journal of Construction Engineering and Management, 139(5), 547–555. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000598
Moselhi, O., & Alshibani, A. (2009). Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), 948–954. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:10(948)
Nabaei, A., Hamian, M., Parsaei, M. R., Safdari, R., SamadSoltani, T., Zarrabi, H., & Ghassemi, A. (2018). Topologies and performance of intelligent algorithms: a comprehensive review. Artificial Intelligence Review, 49(1), 79–103. https://doi.org/10.1007/s10462-016-9517-3
Nassar, K., & Hosny, O. (2011). Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), 931–942. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000512
Parente, M., Cortez, P., & Correia, A. G. (2015). An evolutionary multi-objective optimization system for earthworks. Expert Systems with Applications, 42(19), 6674–6685. https://doi.org/10.1016/j.eswa.2015.04.051
Parente, M., Correia, A. G., & Cortez, P. (2016). A novel integrated optimization system for earthwork tasks. Transportation Research Procedia, 14, 3601–3610. https://doi.org/10.1016/j.trpro.2016.05.428
Sanchez, A. X., Lehtiranta, L. M., & Hampson, K. D. (2015). Use of contract models to improve environmental outcomes in transport infrastructure construction. Journal of Environmental Planning and Management, 58(11), 1923–1943. https://doi.org/10.1080/09640568.2014.969832
Shah, R. K., & Dawood, N. (2011). An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), 435– 448. https://doi.org/10.1080/01446193.2011.563785
Shi, Q., Zuo, J., Huang, R., Huang, J., & Pullen, S. (2013). Identifying the critical factors for green construction–an empirical study in China. Habitat International, 40, 1–8. https://doi.org/10.1016/j.habitatint.2013.01.003
Siami-Irdemoosa, E., & Dindarloo, S. R. (2015). Prediction of fuel consumption of mining dump trucks: A neural networks approach. Applied Energy, 151, 77–84. https://doi.org/10.1016/j.apenergy.2015.04.064
Son, J., Mattila, K. G., & Myers, D. S. (2005). Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), 302–309. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(302)
Szamocki, N., Kim, M., Ahn, C. R., & Brilakis, I. (2019). Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9), 05019012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001690
Trafikverket. (2017). Klimatkrav. https://www.trafikverket.se/for-dig-i-branschen/miljo---for-dig-i-branschen/energi-och-klimat/klimatkrav/
Tuppadung, Y., & Kurutach, W. (2011). Comparing nonlinear inertia weights and constriction factors in particle swarm optimization. International Journal of Knowledge-based and Intelligent Engineering Systems, 15(2), 65–70. https://doi.org/10.3233/KES-2010-0211
UNFCCC. (2015). Adoption of the Paris agreement. Geneva: United Nations Office at Geneva. https://unfccc.int/resource/docs/2015/cop21/eng/l09r01.pdf
Zhang, X., Wu, Y., Shen, L., & Skitmore, M. (2014). A prototype system dynamic model for assessing the sustainability of construction projects. International Journal of Project Management, 32(1), 66–76. https://doi.org/10.1016/j.ijproman.2013.01.009