A holistic literature review of building information modeling for prefabricated construction
Abstract
Building information modeling (BIM) and prefabricated construction (PC) are increasingly applied in the construction industry. Recent academic and industrial efforts indicated that the application of BIM and PC is a solution to reduce lifecycle costs, reduce waste, increase productivity and improve quality in construction. Although previous studies have advanced the integration of BIM and PC, extensive research scope and scattered research topics cannot form an overall picture of knowledge structure. Hence, this study aims to establish an up-to-date synthesis of the latest research on BIM for PC and identify the research gaps and future needs. First, a database with 103 journal articles on BIM for PC was established through data collection; second, a bibliometric analysis was applied to determine the top journals, articles and to map the latest mainstream research. Last, a qualitative analysis was used to determine the mainstream research areas and identify the research gaps and future needs. This study may contribute to enrich our body of knowledge on the use of the techniques in conjunction, help researchers and builders to understand the latest progress of BIM for PC research in timely fashion, and promote the integration of BIM with PC and other cutting-edge technologies moving forward.
Keyword : building information modeling (BIM), prefabricated construction (PC), literature review, bibliometric analysis, research gaps
This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Abedi, M., Fathi, M. S., Mirasa, A. K., & Rawai, N. M. (2016). Integrated collaborative tools for precast supply chain management. Scientia Iranica, 23(2), 429–448. https://doi.org/10.24200/sci.2016.2129
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., Owolabi, H. A., & Kadiri, K. O. (2015). Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvements. Resources, Conservation and Recycling, 102, 101–112. https://doi.org/10.1016/j.resconrec.2015.06.001
Akinade, O. O., Oyedele, L. O., Bilal, M., Ajayi, S. O., Owolabi, H. A., Alaka, H. A., & Bello, S. A. (2015). Waste minimisation through deconstruction: A BIM based Deconstructability Assessment Score (BIM-DAS). Resources, Conservation and Recycling, 105(Part A), 167–176. https://doi.org/10.1016/j.resconrec.2015.10.018
Alwisy, A., Bu Hamdan, S., Barkokebas, B., Bouferguene, A., & Al-Hussein, M. (2019). A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings. International Journal of Construction Management, 19(3), 187–205. https://doi.org/10.1080/15623599.2017.1411458
Annan, C. D., Youssef, M. A., & EI Naggar, M. H. (2009). Seismic overstrength in braced drames of modular steel buildings. Journal of Earthquake Engineering, 13(1), 1–21. https://doi.org/10.1080/13632460802212576
Babič, N. Č., Podbreznik, P., & Rebolj, D. (2010). Integrating resource production and construction using BIM. Automation in Construction, 19(5), 539–543. https://doi.org/10.1016/j.autcon.2009.11.005
Ballard, G., Harper, N., & Zabelle, T. (2003). Learning to see work flow: an application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), 6–14. https://doi.org/10.1108/09699980310466505
Blismas, N. G., Pendlebury, M., Gibb, A., & Pasquire, C. (2005). Constraints to the use of Off-site production on construction projects. Architectural Engineering and Design Management, 1(3), 153–162. https://doi.org/10.1080/17452007.2005.9684590
Bortolini, R., Formoso, C. T., & Viana, D. D. (2019). Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling. Automation in Construction, 98, 248–264. https://doi.org/10.1016/j.autcon.2018.11.031
By, R. T. (2005). Organisational change management: A critical review. Journal of Change Management, 5(4), 369–380. https://doi.org/10.1080/14697010500359250
Cabinet Office. (2011). Government construction strategy. http://www.cabinetoffice.gov.uk
Chen, K., Lu, W., Peng, Y., Rowlinson, S., & Huang, G. Q. (2015). Bridging BIM and building: From a literature review to an integrated conceptual framework. International Journal of Project Management, 33(6), 1405–1416. https://doi.org/10.1016/j.ijproman.2015.03.006
Costa, G., & Madrazo, L. (2015). Connecting building component catalogues with BIM models using semantic technologies: An application for precast concrete components. Automation in Construction, 57, 239–248. https://doi.org/10.1016/j.autcon.2015.05.007
Demian, P., & Walters, D. (2014). The advantages of information management through building information modelling. Construction Management and Economics, 32(12), 1153–1165. https://doi.org/10.1080/01446193.2013.777754
Eastman, C. M., Jeong, Y.-S., Sacks, R., & Kaner, I. (2010). Exchange model and exchange object concepts for implementation of national BIM standards. Journal of Computing in Civil Engineering, 24(1), 25–34. https://doi.org/10.1061/(ASCE)0887-3801(2010)24:1(25)
Erdogan, B., Anumba, C. J., Asce, F., Bouchlaghem, D., & Nielsen, Y. (2014). Collaboration environments for construction: Management of organizational changes. Journal of Management in Engineering, 30(3). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000231
Ezcan, V., Isikdag, U., & Goulding, J. S. (2013, May 5–9). BIM and off-site manufacturing: Recent research and opportunities. In CIB World Building Congress, Construction and Society, Brisbane, Australia.
Gao, S., Low, S. P., & Nair, K. (2018). Design for manufacturing and assembly (DfMA): a preliminary study of factors influencing its adoption in Singapore. Architectural Engineering and Design Management, 14(6), 440–456. https://doi.org/10.1080/17452007.2018.1502653
Gbadamosi, A. Q., Mahamadu, A. M., Oyedele, L. O., Akinade, O. O., Manu, P., Mahdjoubi, L., & Aigbavboa, C. (2019). Offsite construction: Developing a BIM-Based optimizer for assembly. Journal of Cleaner Production, 215, 1180–1190. https://doi.org/10.1016/j.jclepro.2019.01.113
Goodier, C., & Gibb, A. (2007). Future opportunities for offsite in the UK. Construction Management and Economics, 25(6), 585–595. https://doi.org/10.1080/01446190601071821
Guo, J., Wang, Q., & Park, J. H. (2020). Geometric quality inspection of prefabricated MEP modules with 3D laser scanning. Automation in Construction, 111, 103053. https://doi.org/10.1016/j.autcon.2019.103053
Hao, J. L., Cheng, B., Lu, W., Xu, J., Wang, J., Bu, W., & Guo, Z. (2020). Carbon emission reduction in prefabrication construction during materialization stage: A BIM-based life-cycle assessment approach. Science of the Total Environment, 723, 137870. https://doi.org/10.1016/j.scitotenv.2020.137870
He, R., Li, M., Gan, V. J. L., & Ma, J. (2020). BIM-enabled computerized design and digital fabrication of industrialized buildings: A case study. Journal of Cleaner Production, 278, 123505. https://doi.org/10.1016/j.jclepro.2020.123505
Hosseini, M. R., Martek, I., Zavadskas, E. K., Aibinu, A. A., Arashpour, M., & Chileshe, N. (2018). Critical evaluation of offsite construction research: A Scientometric analysis. Automation in Construction, 87, 235–247. https://doi.org/10.1016/j.autcon.2017.12.002
Hu, X., Chong, H.-Y., Wang, X., & London, K. (2019). Understanding stakeholders in off-site manufacturing: A literature review. Journal of Construction Engineering and Management, 145(8), 03119003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001674
Hwang, B. G., Shan, M., & Looi, K. Y. (2018). Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. Journal of Cleaner Production, 183, 183– 193. https://doi.org/10.1016/j.jclepro.2018.02.136
Jeong, Y. S., Eastman, C. M., Sacks, R., & Kaner, I. (2009). Benchmark tests for BIM data exchanges of precast concrete. Automation in Construction, 18(4), 469–484. https://doi.org/10.1016/j.autcon.2008.11.001
Ji, Y., Chang, S., Qi, Y., Li, Y., Li, H. X., Qi, K., & Pellicer, E. (2019). A BIM-based study on the comprehensive benefit analysis for prefabricated building projects in China. Advances in Civil Engineering, Article ID 3720191. https://doi.org/10.1155/2019/3720191
Jin, R., Gao, S., Cheshmehzangi, A., & Aboagye-Nimo, E. (2018). A holistic review of off-site construction literature published between 2008 and 2018. Journal of Cleaner Production, 202, 1202–1219. https://doi.org/10.1016/j.jclepro.2018.08.195
Jin, R., Yuan, H., & Chen, Q. (2019). Science mapping approach to assisting the review of construction and demolition waste management research published between 2009 and 2018. Resources, Conservation and Recycling, 140, 175–188. https://doi.org/10.1016/j.resconrec.2018.09.029
Kaner, I., Sacks, R., Kassian, W., & Quitt, T. (2008). Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms. ITcon, 13(Special issue Case studies of BIM use), 303–323.
Kim, M. K., Cheng, J. C. P., Sohn, H., & Chang, C. C. (2015). A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning. Automation in Construction, 49, 225–238. https://doi.org/10.1016/j.autcon.2014.07.010
Kim, M. K., Wang, Q., Park, J. W., Cheng, J. C. P., Sohn, H., & Chang, C. C. (2016). Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM. Automation in Construction, 72, 102–114. https://doi.org/10.1016/j.autcon.2016.08.035
Larsson, B., Sundqvist, J., Emmitt, S., Larsson, B., Sundqvist, J., & Emmitt, S. (2006). Component manufacturers’ perceptions of managing innovation. Building Research & Information, 34(6), 37–41. https://doi.org/10.1080/09613210600822253
Lee, G., Sacks, R., & Eastman, C. M. (2006). Specifying parametric building object behavior (BOB) for a building information modeling system. Automation in Construction, 15(6), 758–776. https://doi.org/10.1016/j.autcon.2005.09.009
Lee, J., & Kim, J. (2017). BIM-based 4D simulation to improve module manufacturing productivity for sustainable building projects. Sustainability, 9(3), 426. https://doi.org/10.3390/su9030426
Li, C. Z., Hong, J., Xue, F., Shen, G. Q., Xu, X., & Luo, L. (2016). SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong. Habitat International, 57, 74–87. https://doi.org/10.1016/j.habitatint.2016.07.002
Li, C. Z., Xue, F., Li, X., Hong, J., & Shen, G. Q. (2018a). An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction. Automation in Construction, 89, 146–161. https://doi.org/10.1016/j.autcon.2018.01.001
Li, X., Shen, G. Q., Wu, P., Fan, H., Wu, H., & Teng, Y. (2018b). RBL-PHP: Simulation of Lean construction and information technologies for prefabrication housing production. Journal of Management in Engineering, 34(2), 04017053. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000577
Li, L., Li, Z., Li, X., & Wu, G. (2019a). A review of global lean construction during the past two decades: analysis and visualization. Engineering, Construction and Architectural Management, 26(6), 1192–1216. https://doi.org/10.1108/ECAM-03-2018-0133
Li, X., Shen, G. Q., Wu, P., & Yue, T. (2019b). Integrating building information modeling and prefabrication housing production. Automation in Construction, 100, 46–60. https://doi.org/10.1016/j.autcon.2018.12.024
Li, L., Li, Z., Li, X., Zhang, S., & Luo, X. (2020). A new framework of industrialized construction in China: Towards on-site industrialization. Journal of Cleaner Production, 244, 118469. https://doi.org/10.1016/j.jclepro.2019.118469
Lindblad, H., & Vass, S. (2015). BIM implementation and organisational change: A case study of a large Swedish public client. Procedia Economics and Finance, 21(15), 178–184. https://doi.org/10.1016/S2212-5671(15)00165-3
Liu, H., Sydora, C., Altaf, M. S., Han, S., & Al-Hussein, M. (2019). Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings. Journal of Cleaner Production, 235, 1189–1201. https://doi.org/10.1016/j.jclepro.2019.07.055
Liu, D., Li, X., Chen, J., & Jin, R. (2020). Real-time optimization of precast concrete component transportation and storage. Advances in Civil Engineering, Article ID 5714910. https://doi.org/10.1155/2020/5714910
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017). Building Information Modeling (BIM) for green buildings: A critical review and future directions. Automation in Construction, 83, 134–148. https://doi.org/10.1016/j.autcon.2017.08.024
Luo, L. Z., Mao, C., Shen, L. Y., & Li, Z. D. (2015). Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system a case study from China. Engineering, Construction and Architectural Management, 22(6), 622–643. https://doi.org/10.1108/ECAM-04-2014-0048
Martinez, P., Ahmad, R., & Al-Hussein, M. (2019). A visionbased system for pre-inspection of steel frame manufacturing. Automation in Construction, 97, 151–163. https://doi.org/10.1016/j.autcon.2018.10.021
Meho, L. I., & Rogers, Y. (2013). Citation counting, citation ranking, and h-Index of human-computer interaction researchers: A comparison of Scopus and Web of Science. Journal of the American Society for Information Science and Technology, 64, 1852–1863.
Mostafa, S., Kim, K. P., Tam, V. W. Y., & Rahnamayiezekavat, P. (2020). Exploring the status, benefits, barriers and opportunities of using BIM for advancing prefabrication practice. International Journal of Construction Management, 20(2), 146–156. https://doi.org/10.1080/15623599.2018.1484555
Nadim, W., & Goulding, J. S. (2011). Offsite production: A model for building down barriers: A European construction industry perspective. Engineering, Construction and Architectural Management, 18(1), 82–101. https://doi.org/10.1108/09699981111098702
Nath, T., Attarzadeh, M., Tiong, R. L. K., Chidambaram, C., & Yu, Z. (2015). Productivity improvement of precast shop drawings generation through BIM-based process re-engineering. Automation in Construction, 54, 54–68. https://doi.org/10.1016/j.autcon.2015.03.014
National Building Information Model Standard Project Committee. (2018). National BIM standard – United States.
Nawari, N. O. (2012). BIM standard in off-site construction. Journal of Architectural Engineering, 18(2), 107–113. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000056
Nawi, M. N. M., Haron, A. T., Hamid, Z. A., Kamar, K. A. M., & Baharuddin, Y. (2014). Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) construction projects. Malaysian Construction Research Journal, 15(2), 29–38. https://doi.org/10.1051/matecconf/20141501025
O’Connor, J. T., O’Brien, W. J., & Choi, J. O. (2016). Industrial project execution planning: Modularization versus stick-built. Practice Periodical on Structural Design and Construction, 21(1), UNSP 04015014. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000270
Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017). Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review. International Journal of Project Management, 35(7), 1288–1301. https://doi.org/10.1016/j.ijproman.2017.07.001
Poirier, E. A., Staub-French, S., & Forgues, D. (2015). Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research. Automation in Construction, 58, 74–84. https://doi.org/10.1016/j.autcon.2015.07.002
Rahimian, F. P., Chavdarova, V., Oliver, S., & Chamo, F. (2019). OpenBIM-Tango integrated virtual showroom for offsite manufactured production of self-build housing. Automation in Construction, 102, 1–16. https://doi.org/10.1016/j.autcon.2019.02.009
Qi, Y., Chang, S., Ji, Y., & Qi, K. (2018). BIM-based incremental cost analysis method of prefabricated buildings in China. Sustainability, 10(11), 4293. https://doi.org/10.3390/su10114293
Ramaji, I. J., & Memari, A. M. (2018). Extending the current model view definition standards to support multi-storey modular building projects. Architectural Engineering and Design Management, 14(1–2), 158–176. https://doi.org/10.1080/17452007.2017.1386083
Sacks, R., Eastman, C. M., Lee, G., & Orndorff, D. (2005). A target benchmark of the impact of three-dimensional parametric modeling in precast construction. PCI Journal, 50(4), 126–139. https://doi.org/10.15554/pcij.07012005.126.139
Sacks, R., Koskela, L., Dave, B. A., & Owen, R. (2010). Interaction of Lean and Building information modeling in construction. Journal of Construction Engineering and Management, 136(9), 968–980. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000203
Singh, M. M., Sawhney, A., & Borrmann, A. (2019). Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(1), 15–31. https://doi.org/10.1080/15623599.2017.1358077
Tan, T., Chen, K., Xue, F., & Lu, W. (2019). Barriers to Building Information Modeling (BIM) implementation in China’s prefabricated construction: An interpretive structural modeling (ISM) approach. Journal of Cleaner Production, 219, 949–959. https://doi.org/10.1016/j.jclepro.2019.02.141
Tang, X., Chong, H.-Y., & Zhang, W. (2019). Relationship between BIM implementation and performance of OSM projects. Journal of Management in Engineering, 35(5), 04019019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000704
Turk, Ž. (2006). Construction informatics: Definition and ontology. Advanced Engineering Informatics, 20(2), 187–199. https://doi.org/10.1016/j.aei.2005.10.002
van Eck, N. J., & Waltman, L. (2010). Software survey: VOSviewer, a computer program for bibliometric mapping. Scientometrics, 84(2), 523–538. https://doi.org/10.1007/s11192-009-0146-3
Wang, Q., Kim, M.-K., Cheng, J. C. P., & Sohn, H. (2016). Automated quality assessment of precast concrete elements with geometry irregularities using terrestrial laser scanning. Automation in Construction, 68, 170–182. https://doi.org/10.1016/j.autcon.2016.03.014
Wang, Q., Sohn, H., & Cheng, J. C. P. (2018a). Automatic as-built BIM creation of precast concrete bridge deck panels using laser scan data. Journal of Computing in Civil Engineering, 32(3), 04018011. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000754
Wang, Q., Guo, Z., Mei, T., Li, Q., & Li, P. (2018b). Labor crew workspace analysis for prefabricated assemblies’ installation: A 4D-BIM-based approach. Engineering, Construction and Architectural Management, 25(3), 374–411. https://doi.org/10.1108/ECAM-09-2016-0210
Wang, Z., Hu, H., Gong, J., Ma, X., & Xiong, W. (2019). Precast supply chain management in off-site construction: A critical literature review. Journal of Cleaner Production, 232, 1204–1217. https://doi.org/10.1016/j.jclepro.2019.05.229
Wong, P. S. P., Zwar, C., & Gharaie, E. (2017). Examining the drivers and states of organizational change for greater use of prefabrication in construction projects. Journal of Construction Engineering and Management, 143(7), 04017020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001309
Wuni, I. Y., & Shen, G. Q. (2020). Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies. Journal of Cleaner Production, 249, 119347. https://doi.org/10.1016/j.jclepro.2019.119347
Xu, Z., Kang, R., & Lu, R. (2020). 3D reconstruction and measurement of surface defects in prefabricated elements using point clouds. Journal of Computing in Civil Engineering, 34(5), 04020033. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000920
Xue, H., Zhang, S., Su, Y., Wu, Z., & Yang, R. J. (2018a). Effect of stakeholder collaborative management on off-site construction cost performance. Journal of Cleaner Production, 184, 490–502. https://doi.org/10.1016/j.jclepro.2018.02.258
Xue, X., Zhang, X., Wang, L., Skitmore, M., & Wang, Q. (2018b). Analyzing collaborative relationships among industrialized construction technology innovation organizations: A combined SNA and SEM approach. Journal of Cleaner Production, 173, 265–277. https://doi.org/10.1016/j.jclepro.2017.01.009
Zhai, Y., Chen, K., Zhou, J. X., Cao, J., Lyu, Z., Jin, X., Shen, G. Q. P., Lu, W., & Huang, G. Q. (2019). An Internet of Things-enabled BIM platform for modular integrated construction: A case study in Hong Kong. Advanced Engineering Informatics, 42, 100997. https://doi.org/10.1016/j.aei.2019.100997
Zhang, J., Li, H., Golizadeh, H., Zhao, C., Lyu, S., & Jin, R. (2020). Reliability evaluation index for the integrated supply chain utilising BIM and lean approaches. Engineering, Construction and Architectural Management, 27(5), 997–1038. https://doi.org/10.1108/ECAM-12-2018-0542
Zhong, R. Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., Ng, S. T., Lu, W., Shen, G. Q. P., & Huang, G. Q. (2017). Prefabricated construction enabled by the Internet-of-Things. Automation in Construction, 76, 59–70. https://doi.org/10.1016/j.autcon.2017.01.006