Vol 28 No 2 (2022)
Published: 2022-01-14
Articles
Case study on performance monitoring and stability analysis of Baishihu suspension bridge and side slope
Abstract 722 | PDF Downloads 639 | DOI https://doi.org/10.3846/jcem.2022.15783
Page 81–92
Seismic vulnerability of reinforced concrete bridges in Pakistan
Abstract 724 | PDF Downloads 711 | DOI https://doi.org/10.3846/jcem.2022.15854
Page 93–105
Rent-seeking decisions of the main participants in construction projects based on evolutionary-game and system dynamics
Abstract 797 | PDF Downloads 624 | DOI https://doi.org/10.3846/jcem.2022.16159
Page 106–119
Barriers to the adoption of new safety technologies in construction: a developing country context
Abstract 2926 | PDF Downloads 2468 | DOI https://doi.org/10.3846/jcem.2022.16014
Page 120–133
How to get international construction projects delivered on time: from Chinese contractors’ perspective
Abstract 1063 | PDF Downloads 827 | DOI https://doi.org/10.3846/jcem.2022.16381
Page 134–149
Conceptual cost estimation framework for modular projects: a case study on petrochemical plant construction
Abstract 1295 | PDF Downloads 1189 | DOI https://doi.org/10.3846/jcem.2022.16234
Page 150–165